My personal contributions to the project included the management of resources, overseeing production of the written deliverables, preliminary hand analysis, and managing the electronic circuit.
In terms of management, I planned our timeline according to the required course deadlines and our estimated production and shipping times. Additionally, for each report and presentation I created a template and distributed the content that needed to be produced based on my working knowledge of each team member's skills. By creating a preliminary structure, we were able to create cohesive and logical presentations and reports. Additionally, I was the only person responsible for integrating the electronics components and I selected and ordered components based on the required specs, which were determined by the available stock as well as hand analysis.